The architect for the Pacific Gas and Electric building located in Rocklin, California specified SCAFCO SoundGuard studs to eliminate having to build a double wall (saving labor and staying on or ahead of the build schedule) and also maintaining and exceeding the Sound Transmission Class (STC).
![](https://i0.wp.com/www.cwalla.com/wp-content/uploads/Turner-Construction-2-IMG_0055-web.jpg?resize=1024%2C768&ssl=1)